Company:
Lonas Lorenzo S.A. De C.V. Guadalajara, jal

Project Details

Fabric 1

Solar Screen
Producer: Saint-Gobain Technical Fabrics
Supplier: Saint-Gobain Technical Fabrics


Engineer Name 1
Rodolfo Ulloa

Engineer Company 1
Lonas Lorenzo SA de CV

Design Name
Jose de Arimatea Moyao

Design Company
Moyao Arquitectos

Architect Name
Jose de Arimatea Moyao

Architect Company
Moyao Arquitectos

Fabrication Company
Lonas Lorenzo SA de CV

Installation Company
Lonas Lorenzo SA de CV


Please describe the project specifications

Temporary Structure that require to be assembled in only 36 hours from zero and need to be self standing during the expo for three days.


What was the purpose of this project? What did the client request?

Saint Gobain in its 350th anniversary carried out through the Moyao Architect the construction of a pavilion for Expo 2015 CIAHC in Mexico City, where the multinational company’s variety of products was shown.


What is unique or complex about the project?

We were entrusted with the embodiment of a cover tensioned by wires and a central mast which gave an interesting project scale.


What were the results of the project?

The result was a very interesting and scaled space inside the stand, the client was very happy because they show all the material for the 350 anniversary of the brand.


Content is submitted by the participant. IFAI is not responsible for the content descriptions of the IAA award winners.